Where the engineer calls for bored piers, they carry the house down through the clay. We check every hole for position, depth, width and a clean base before concrete fills it.

  • With the holes drilled and cages placed, before the concrete truck is booked
  • About 1 hour on site
  • Report within 24 hours
Price your inspectionSend your details and the inspector rings you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage1 of 7
When to bookWith the holes drilled and cages placed, before the concrete truck is booked
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, the geotechnical report and the engineer's footing design

What is included in a Truganina bored piers inspection

  • Every pier located against the footing layout
  • Shaft width taken at the top of the hole
  • Depth compared with the engineer's figure
  • Base cleaned back to firm founding material
  • Spoil, water or collapse noted in each shaft
  • Reinforcing cage size and bar count
  • Cage spacers and cover to the sides
  • Starter bars placed to suit the beams above
  • Pier and beam connection detail
  • Set-out pegs and boundary offsets sighted
  • Drainage and stormwater near the pier line
  • Photo record of every hole before concrete
Why it matters here

Bored piers inspections on Truganina builds

The basalt plains under Truganina carry clay that swells when wet and shrinks when dry, sometimes over rock at uneven depth. Piers are specified to reach stable material below that movement, so a hole left with loose spoil in the bottom, or stopped short, can undo the design before the house is even framed.

What we find at this stage in Truganina

  • Loose spoil left at the base of the pier holes
  • Soil falling back into a drilled shaft
  • Hole depth short of the engineer's figure
  • Cage sitting on the base with no cover
  • Pier set out away from the footing plan
  • Site levels that will drain towards the slab
Dirt fallen back into a bored pier shaft before the pour, Donnybrook, Truganina
Dirt fallen back into a bored pier shaft before the pour, Donnybrook
Site that will need grading after the pour so water cannot pool near the slab, Donnybrook, Truganina
Site that will need grading after the pour so water cannot pool near the slab, Donnybrook
Block levels to be regraded once the slab is down, so rain drains away, Donnybrook, Truganina
Block levels to be regraded once the slab is down, so rain drains away, Donnybrook
Sample findings

Sample defects found during our bored piers inspections in Truganina

Annotated findings from Bored piers inspections.

Loose spoil left at the base of a bored pier ahead of the concrete, found during a bored pier inspection in Donnybrook
Loose spoil left at the base of a bored pier ahead of the concrete, Donnybrook
Pier hole still holding loose soil that has to come out down to firm ground, found during a bored pier inspection in Donnybrook
Pier hole still holding loose soil that has to come out down to firm ground, Donnybrook
Bored pier bottom not yet cleaned down to the hard founding layer, found during a bored pier inspection in Donnybrook
Bored pier bottom not yet cleaned down to the hard founding layer, Donnybrook
Loose material in a pier that would sit between the concrete and firm ground, found during a bored pier inspection in Donnybrook
Loose material in a pier that would sit between the concrete and firm ground, Donnybrook
Bored pier needing its base cleaned out before the concrete goes in, found during a bored pier inspection in Gisborne
Bored pier needing its base cleaned out before the concrete goes in, Gisborne

The other stages of a Truganina build

  1. Slab pre-pour inspection in Truganina2Slab pre-pourSteel tied, pods down, plumbing in, and the pour still a day or two away
  2. Frame inspection in Truganina3FrameRoof trusses on, frame complete, and nothing wrapped or clad yet
  3. Lock-up (pre-plaster) inspection in Truganina4Lock-up (pre-plaster)Bricks laid, windows fitted, roof on, and the plasterboard not yet delivered
  4. Fixing inspection in Truganina5FixingPlaster up, doors hung, cabinets in, painters not yet started
  5. Waterproofing inspection in Truganina6WaterproofingMembrane cured in every wet area, tiles still in their boxes
  6. Pre-handover (PCI) inspection in Truganina7Pre-handover (PCI)Builder says the home is complete and before you pay the final claim

All construction stage inspections in Truganina →

Guides

Construction stage guides for Truganina

All guides →

Book a bored piers inspection in Truganina

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Bored piers inspections in Truganina: common questions

Does every Truganina build need bored piers?

No. Piers are specified by the engineer where the soil report or the design calls for them, for example deep fill, a sloping lot or a heavy load point. Many homes go straight to a slab with deepened edge beams.

What harm does loose soil at a pier base do?

The pier is designed to bear on firm material. Loose soil at the bottom compresses under load, so the pier can settle even though the concrete above it is sound.

How long does the bored pier check take?

About an hour on site for a typical set of piers, longer for a large footprint.

What are the piers measured against?

The engineer's footing design and soil report for your lot, AS 2870 for residential footings and AS 3600 for the concrete work.

Can piers be checked after the concrete is in?

Only the tops. Depth and base condition cannot be seen after the pour, which is why this stage has to be booked before the concrete truck.

What if the concrete goes in before the inspector gets there?

Ask your builder for evidence of the pier inspection by their engineer or surveyor. Then make sure the slab stage is booked in good time so the next opportunity is not missed.