Truganina Building
Inspections
★★★★★ 4.8 on Google · 570+ reviews

Waterproofing inspection in Truganina

Once the membrane is on and before any tile goes down, we check the bathrooms, ensuite, laundry and any balcony for coverage, junctions and clear drains.

  • Membrane cured in every wet area, tiles still in their boxes
  • About 1 hour on site
  • Report within 24 hours
Price your inspectionSend your details and the inspector rings you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage6 of 7
When to bookMembrane cured in every wet area, tiles still in their boxes
Time on siteAbout 1 hour on site
Inspected againstAS 3740 (waterproofing of domestic wet areas), AS 3958 (tiling), NCC Volume Two Part 10.2

What is included in a Truganina waterproofing inspection

  • Membrane coverage across each wet area floor
  • Wall upturns behind and beside the shower
  • Bath hob junctions lapped 40mm each side
  • Bond breakers at internal corners
  • Puddle flanges at every floor waste
  • Drains clear of cement and debris
  • Screed falls towards the waste
  • Membrane free of tears and pinholes
  • Balcony membranes complete to edges
  • Articulation joints sealed in the wet zone
  • Penetrations for taps and mixers sealed
  • Curing time before tiling confirmed
Why it matters here

Waterproofing inspections on Truganina builds

The waterproofing faults we see in Truganina are mostly about what happened around the membrane: cement in a floor waste, a drain blocked with debris, a hob junction that does not lap far enough, a balcony left short of its final coat. All of them are a ten minute fix with the floor open and a retile once it is not.

What we find at this stage in Truganina

  • Membrane damaged before tiling
  • Cement and debris in the floor waste
  • Bath hob junction short of 40mm each side
  • Balcony membrane missing its last coat
  • Articulation joint not sealed
  • Membrane upturns too low behind the shower
Second bath hob corner where the membrane does not lap far enough, Truganina
Second bath hob corner where the membrane does not lap far enough
Balcony membrane still short of its final coat at the upper edge, Truganina
Balcony membrane still short of its final coat at the upper edge
Shower enclosure leaking water during the handover inspection, Truganina
Shower enclosure leaking water during the handover inspection
Sample findings

Sample defects found during our waterproofing inspections in Truganina

Annotated findings from Waterproofing inspections.

Shower membrane damaged and needing repair before any tile is laid, found during a waterproofing inspection in Truganina
Shower membrane damaged and needing repair before any tile is laid
Shower drain fully blocked with debris before tiling had even started, found during a waterproofing inspection in Truganina
Shower drain fully blocked with debris before tiling had even started
Cement left in a wet area drain where it will set and cause a blockage, found during a waterproofing inspection in Truganina
Cement left in a wet area drain where it will set and cause a blockage
Articulation joint left unsealed, letting water in behind the joint band, found during a waterproofing inspection in Truganina
Articulation joint left unsealed, letting water in behind the joint band
Balcony membrane incomplete and needing another coat before tiling, found during a waterproofing inspection in Truganina
Balcony membrane incomplete and needing another coat before tiling

The other stages of a Truganina build

  1. Bored piers inspection in Truganina1Bored piersWith the holes drilled and cages placed, before the concrete truck is booked
  2. Slab pre-pour inspection in Truganina2Slab pre-pourSteel tied, pods down, plumbing in, and the pour still a day or two away
  3. Frame inspection in Truganina3FrameRoof trusses on, frame complete, and nothing wrapped or clad yet
  4. Lock-up (pre-plaster) inspection in Truganina4Lock-up (pre-plaster)Bricks laid, windows fitted, roof on, and the plasterboard not yet delivered
  5. Fixing inspection in Truganina5FixingPlaster up, doors hung, cabinets in, painters not yet started
  6. Pre-handover (PCI) inspection in Truganina7Pre-handover (PCI)Builder says the home is complete and before you pay the final claim

All construction stage inspections in Truganina →

Guides

Construction stage guides for Truganina

All guides →

Book a waterproofing inspection in Truganina

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Waterproofing inspections in Truganina: common questions

Why is waterproofing booked apart from the fixing visit?

Yes. Waterproofing has to be seen before tiles cover it, and fixing happens later, after plaster and joinery. Combining them means one of them is missed.

Which standard applies to wet area waterproofing?

AS 3740 for domestic wet areas, the NCC requirements for wet areas, and the membrane manufacturer's instructions.

Is the membrane flood tested on the day?

No flood testing. The inspection is visual, with measurements of upturns and laps, and checks of drains and penetrations.

Why worry about a blocked drain before tiling?

Cement left in a waste sets hard and restricts flow for the life of the bathroom. Water backs up and finds the weakest junction.

How long does it take?

About an hour for a typical two bathroom home with a laundry.

Is a balcony membrane included in the visit?

Yes. Balcony membranes are checked for coverage and edges at the same visit.

CallGet a Free Quote